JZ-FSC Firestop Sealing Stuff

Technical Data:

  • Colour:Light grey powder

  • Density (Cured):1680Kg/m3

  • Mixing proportion (Powder: liquid):3:2

  • Ambient temperature for curing:≥4°C

  • Initial setting time(Room temperature):60±15 Minutes

  • Initial curing time (Room temperature):2-3 Hours

  • Time to chemical hardness(Room temperature):48-72 Hours

  • Compressive strength(-55℃-140℃):≥20Mpa

  • Water tightness :0.35Mpa; Gas tightness:0.1Mpa

  • Thermal Conductivity:≤0.6W/M.K

  • Applicable temperature environment:-55℃-140℃

  • Halogen free

  • Storage condition:0-35℃,Indoor dry environment

Packing:

  • Part A:10kg/bucket; Part B:6.75kg/bucket;

Recommended solutions
Recommended solutions